H-D School Board gets “sticker shock” from proposed South Side expansion
sites/default/files/HD Graphic School Site Proposed Options.jpg
Renovations could exceed $10 million
The Hampton-Dumont Community School Board of Education held a special workshop session with Davenport-based Estes Construction and Waterloo-based Invision Architecture Dec. 4.
The project, which was done through the Iowa Construction Advocate Team (ICAT), a service offered by the Iowa Association of School Boards, was an initial look at the current facility needs of the district.
Paul Newhart, of Estes, and Kate Payne, of Invision, were on hand to present their findings.
“This is not the end,” Newhart said. “This is just the beginning. It’s the starting point.”
Newhart and Payne were two of the four members of the team who came to Hampton for a “Design in a Day” project.
Read the full article in the Dec. 11 edition of the Hampton Chronicle.
Opinion of Probable Costs PDF information is attached below.
Hampton Chronicle
9 Second Street NW
Hampton, IA 50441
Phone: 641-456-2585
Fax: 1-800-340-0805
Email: news@midamericapub.com
Mid-America Publishing
This newspaper is part of the Mid-America Publishing Family. Please visit www.midampublishing.com for more information.